One lines company, Marlborough Lines, runs the power across Marlborough, from Blenheim and Picton out to the Sounds. Its urgent fault line, 03 577 7007, takes outages, part power, lines down and trees on lines, 24/7. For the wiring inside your home, tell us what's going on and we'll match you with one licence-checked local sparky who does that kind of work.
Marlborough Lines at a glance
Urgent faults, 24/7: 03 577 7007
Check your main switchboard before you report no power. Non-urgent faults go through its online form, watched Monday to Friday, 8am to 4:30pm.
One way in from the grid
The whole network is fed from a single grid exit point near Springlands, through 16 zone substations.
Baches and the Sounds
A supply that's been disconnected for more than six months needs a Certificate of Verification before it's reconnected. Worth knowing before you reopen a holiday place.
Quakes, floods and wind
The magnitude 6.6 quake near Seddon on 16 August 2013 cut power to about 4,000 Marlborough properties, all back by the next afternoon. After the 2016 Kaikōura earthquake, Seddon had power again by the next morning, but Ward still had neither power nor water late on 15 November.
In the August 2022 floods about 2,000 Marlborough Lines customers had outages, and nearly 500 were still off on 21 August, mostly in the Sounds. On 23 October 2025, strong winds cut power to more than 20,000 customers, most of them back shortly after midday.
If lines are down, Marlborough Lines says to keep people and animals at least 10 metres away, and to stay inside your vehicle if lines are on it. After a quake, get an electrician to check any damage inside the house before you switch everything back on.
Sun, solar and new connections
Blenheim averages 2,475 sunshine hours a year, the most of any New Zealand town or city, NIWA says. Marlborough Lines needs a connection application before solar or a battery is installed. Since 11 May 2026 its default export limit is 10 kW, but 5 kW in congestion-managed areas and 2 kW on single wire earth return (SWER) lines.
Building? Standard connections take about 4 to 6 weeks to livening and complex ones about 16 to 24, and nothing is livened until it's certified and inspected (new connections).
Which certificate should you get?
| Low-risk work | General work | High-risk work | |
|---|---|---|---|
| For example | Replacing a switch, power point or RCD | New circuits, sub-boards, rewires | Mains work, solar PV, a higher-capacity switchboard |
| Paperwork | Electrical Safety Certificate | Certificate of Compliance plus an ESC | CoC, ESC and a Record of Inspection from a licensed electrical inspector |
Local pages
Those rules are the same nationwide (certificates explained). For more local detail, see Blenheim and Picton.
What we'd do in Marlborough
Find out the export limit for your address before you size a solar system, because 2 kW and 10 kW make for very different setups. Got a bach in the Sounds? Have the wiring looked at before summer, not in the middle of it.
Want a specialist to sort it?
Tell us the job and your postcode. We match the licence-checked local electrician who does this kind of work, and they call you. No ring-around, and your number goes to them alone.
Pick your area
Cities and towns in Marlborough
Questions
Straight answers.
Can I trim a tree near a power line?
Not within 4 metres of a line without a Close Approach Permit from Marlborough Lines. Tree owners are generally responsible for keeping trees clear of lines, and Marlborough Lines pays for a qualifying first cut or trim.
Who tells me about a planned outage?
Your retailer. Marlborough Lines says your power company will let you know about a planned outage that affects you, and if someone in the house relies on medical equipment, tell your power company now.
Related help
Helpful next
Where this information comes from
- Marlborough Lines Report a Fault, checked 29 October 2026
- Marlborough Lines Electrical Safety, checked 29 October 2026
- Marlborough Lines Network Information, checked 29 October 2026
- Marlborough Lines Preparing for a Power Outage, checked 29 October 2026
- Marlborough Lines Connect or Alter My Supply, checked 29 October 2026
- Marlborough Lines Connections Requirements and Standards, checked 29 October 2026
- Marlborough Lines Connect Distributed Generation, checked 29 October 2026
- Marlborough Lines Trees and Vegetation, checked 29 October 2026
- RNZ Five houses uninhabitable due to quake damage (17 August 2013), checked 29 October 2026
- RNZ 'The kids are too scared to go in the house' (16 November 2016), checked 29 October 2026
- RNZ (Local Democracy Reporting) 'It's a widespread disaster': Supply concerns as Marlborough communities cut off (22 August 2022), checked 29 October 2026
- 1News Top of South Island hit by power outages as strong winds batter NZ (23 October 2025), checked 29 October 2026
- NIWA (now Earth Sciences New Zealand) The climate and weather of Marlborough, 2nd edition (P.R. Chappell, NIWA Science and Technology Series 69), checked 2016
- EWRB Toolbox What paperwork do I need to complete?, checked 28 October 2026
- EWRB Toolbox Is this high-risk work, and do I need an inspection?, checked 28 October 2026
Rules change, so check with the EWRB, WorkSafe or Tenancy Services if something matters to your job. How we write and check these pages.